新聞

查看以下最新雷莫新聞。在這里,您將找到來自我們全球集團以及與您息息相關的本地新聞的基本信息。您將了解到我們最新創新的詳情,產品更新以及我們最近獲得的獎項信息。

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

LEMO opens a new facility in the Netherlands to strengthen its services
To support the unprecedented growth of its Benelux business, LEMO has invested in a new, purpose-built, hi-tech and eco-friendly facility near Amsterdam.LEMO opened its Dutch subsidiary in 2005 initially to cover the Benelux market. Meanwhile, its staff grew from 2 to over 50 people. Today, LEMO Netherlands has a cable assembly department as well and is home to the LEMO European Distribution Centr

LEMO now showcases its product line on EPLAN Data Portal
The EPLAN Data Portal is an integral part of the EPLAN drawing platform, which enables users to significantly reduce effort & engineering time, and also to easily generate the detailed and accurate documentation that is required by today’s end users of automation systems.EPLAN Data Portal contains a wide library of CAD components: over 900’000 data sets from more than 290 manufacturers.