CONNECTED magazine n°8

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

1969 - A giant leap for LEMO
50 years ago, Neil Armstrong wasn’t the only one taking some important steps. In early December of that year, LEMO first set foot in Germany and this new subsidiary was to become one of the largest in the Group.

LEMO launches a new 3GHz coaxial contact (75 ohm) designed for RG 179 B/U type cable.
This contact can be used in various insulator configurations: 3 x coaxial, 4x coaxial, 10 x coaxial, as well as in combinations of coaxial and low voltage signal contacts.

PEI-Genesis Expands Distribution Partnership with LEMO to Include Europe, Israel, and Africa
PEI-Genesis, a global leader in the design and assembly of custom engineered connectors and cable solutions, has announced the expansion of its distribution partnership with LEMO, the global leader in circular Push-Pull connectors.