CONNECTED magazine n°8

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

Growth spurt for LEMO 5
Exactly 10 years ago, the LEMO 5 factory was extended to its current size. The company plays a crucial role in the LEMO galaxy, producing a significant amount of the brass components for its connectors.

Cutting-edge technology for better water quality
At a time when new technologies keep emerging and replacing each other, LEMO provides a rare, even unique, service.

The robot with a human touch
Walkman mimics human movements in a strikingly accurate way. Its designers have developed it in record time and predict a great future for it.

Fitted for fever pitch broadcast
The Euro 2016 football final took place in Stade de France on 10th July. Thanks to the high technology cable network installed by Synoptic Broadcast.