CONNECTED magazine n°8
?
學習與探索

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

LEMO launches a 1000 Base T1- Single Pair Ethernet (SPE) Push-Pull connector
Based on transmission standards (IEEE 802.3), single-pair Ethernet (also called SPE or 1000Base-T1) is integrated into new generations of automobiles. 1000Base-T1 is designed to operate over a single twisted-pair copper cable supporting an effective data rate of 1 Gbit/sec in each direction simultaneously.

LEMO Canada is Moving to a New Location
LEMO Canada is happy to announce that we have moved into new business premises since September 20, 2013. The new location is ideally located in Richmond Hill, Ontario.