CONNECTED magazine n°7

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

LEMO magazine CONNECTED n°14
The 14th issue of LEMO's CONNECTED magazine is out!Connectors to combat the virusThe urge to breatheAt the heart of the Dakar rally

LEMO’s new HARPOON: Press fit contacts for elbow and straight PCB sockets
LEMO connector is well known for its Push-Pull connector. LEMO’s new harpoon earthing pins enable pre-installing easily various receptacles/socket.The advantage of these new press-fit contacts is the gain of time while doing the pre-assembly, no need to place the washers and screw 4 times the M1.6 screws.Simply align the connector and push firmly. This pre-assembly will enable the assembly house o

1969 - A giant leap for LEMO
50 years ago, Neil Armstrong wasn’t the only one taking some important steps. In early December of that year, LEMO first set foot in Germany and this new subsidiary was to become one of the largest in the Group.