CONNECTED magazine n°6

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

EPFLOOP - 3rd place at the Hyperloop competition
Nothing was certain for the EPFLOOP team from Switzerland when they completed the “intent to compete form” in September 2017 and decided to participate in the competition for the first time. The EPFLOOP team made their way through all the qualification steps and was one of the 3 teams allowed to launch their pod in the 1.6km vacuum tube at Hyperloop test track adjacent to SpaceX’s Hawthorne CA hea

Appointment of new Managing Director at LEMO UK
We are pleased to announce the appointment of Peter Dent as Managing Director, LEMO UK Ltd and he will be taking up the role with effect from 1st October.