CONNECTED magazine n°3

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

1969 - A giant leap for LEMO
50 years ago, Neil Armstrong wasn’t the only one taking some important steps. In early December of that year, LEMO first set foot in Germany and this new subsidiary was to become one of the largest in the Group.

EPFLOOP - 3rd place at the Hyperloop competition
Nothing was certain for the EPFLOOP team from Switzerland when they completed the “intent to compete form” in September 2017 and decided to participate in the competition for the first time. The EPFLOOP team made their way through all the qualification steps and was one of the 3 teams allowed to launch their pod in the 1.6km vacuum tube at Hyperloop test track adjacent to SpaceX’s Hawthorne CA hea