CONNECTED magazine n°1

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

1969 - A giant leap for LEMO
50 years ago, Neil Armstrong wasn’t the only one taking some important steps. In early December of that year, LEMO first set foot in Germany and this new subsidiary was to become one of the largest in the Group.

Halo LED connector
This product includes a LED lit flange allowing to display the connection status, which enables the user to have immediate visual identification showing that the connector is securely connected and powered up.

New T series design
LEMO enhances the T series range with a new design, the connector plug and free socket now include the LEMO "chocolate design" pattern, already on LEMO’s traditional products, B and K series. This new design is completely compatible with previous designs. The TT, 0T and 1T series will be available with 3 latches. Caps are to be updated to reflect the chocolate plate as well.