CONNECTED magazine n°15

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

1969 - A giant leap for LEMO
50 years ago, Neil Armstrong wasn’t the only one taking some important steps. In early December of that year, LEMO first set foot in Germany and this new subsidiary was to become one of the largest in the Group.

SUN, CARS AND STUDENTS
The 2017 edition of the prestigious World Solar Challenge will be held in October. The Dutch team Solar Team Twente have been getting ready to win.

FROM NANOTECHNOLOGY TO ASTRONOMY
It is impossible to observe outer space through a telescope with a deformed mirror. How can you ensure ultra-precision positioning and compensate for any deformation?