CONNECTED magazine n°15

學(xué)習(xí)與探索
    lemo germany building
    Magazine

    1969 - A giant leap for LEMO

    50 years ago, Neil Armstrong wasn’t the only one taking some important steps. In early December of that year, LEMO first set foot in Germany and this new subsidiary was to become one of the largest in the Group.

    medical device
    Insights

    Integrated Electronics

    Medical device design engineers and military equipment designers face similar challenges: a need to save valuable PC board space. One popular solution is to integrate electronics into a connector. An example of connector manufacturers doing this for many years is a connector integrating noise filtering and EMP (Electromagnetic Pulse) suppression components into the rear shell of circular or d-sub

    budapest building
    News

    New Factory in Budapest Hungary

    To increase LEMO's production capacities, a new factory has been built in Budapest-Hungary. The new factory has been running since November 2010 and has a total surface of 10'240 m2.  It is the only LEMO Group factory that combines all the manufacturing processes within one site : injection molding, assembly and plating....