CONNECTED magazine n°11

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

LEMO USA, Inc. Achieves 2016 Revision for ISO 13485 Certification
LEMO USA, Inc. is proud to announce that they have received their certificate for the 2016 revision of the ISO 13485 standard. These certifications are accredited by SQS, Swiss Association for Quality and Management in partnership with IQNet.

Beyond connectors
LEMO’s long experience and solid expertise in the field of connector and cable assembly has now beenextended by offering complete interconnection solutions.

Sculpteo: the success of a factory in the cloud
"There began to be a lot of talk about 3D software,3D objects and 3D printing in 2009” explains Clément Moreau, co-founder of Sculpteo. “For us, it was a new revolution in the history of industry. So we started to get ready for when the big wave would arrive…”

Printing an exact copy of the patient
In the printer are two polymer materials owned by 3D Systems: the material which will “hold” the finest elements and the building material itself. Once it's printing, the machine super- poses – one by one – layers 32 microns deep.

NiCorAl? treatment, a salt spray corrosion resistant solution
Designed for Harsh environments, the new Lemo salt fog corrosion treatment offers extensive features.