CONNECTED magazine n°10

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

"the first step towards success: boldness."
An interview with Alexandre Pesci at the heart of the Dakar Rally.It was back in January, just before the COVID-19 became a global crisis : the legendary Dakar Rally raced through the harsh desert lands of Saudi Arabia. Among the competitors, there was the LEMO Group’s CEO, Alexandre Pesci. The story of a childhood dream come true, a breath of fresh air welcome in the current climate.

Opening of LEMO Latin America
The LEMO group is proud to announce the creation of LEMO Latin America. The sales office is located in the city of Campinas in the state of S?o Paulo - Brazil.