CONNECTED magazine n°10
?
學習與探索

A new REDEL production site is inaugurated!
The new REDEL 2 production site, at 400m from the main site (St-Croix, Switzerland), was officially inaugurated on 3rd September 2020. +34% REDEL production surface area, 7038m2+16% REDEL staff, 157, of which 44 people at REDEL 2.

SUN, CARS AND STUDENTS
The 2017 edition of the prestigious World Solar Challenge will be held in October. The Dutch team Solar Team Twente have been getting ready to win.

FROM NANOTECHNOLOGY TO ASTRONOMY
It is impossible to observe outer space through a telescope with a deformed mirror. How can you ensure ultra-precision positioning and compensate for any deformation?

Digikey Distribution Agreement
Digi-Key Corporation Signs Global Distribution Agreement with LEMO