CONNECTED magazine n°10

EPFLOOP - 3rd place at the Hyperloop competition
Nothing was certain for the EPFLOOP team from Switzerland when they completed the “intent to compete form” in September 2017 and decided to participate in the competition for the first time. The EPFLOOP team made their way through all the qualification steps and was one of the 3 teams allowed to launch their pod in the 1.6km vacuum tube at Hyperloop test track adjacent to SpaceX’s Hawthorne CA hea

Integrated Electronics
Medical device design engineers and military equipment designers face similar challenges: a need to save valuable PC board space. One popular solution is to integrate electronics into a connector. An example of connector manufacturers doing this for many years is a connector integrating noise filtering and EMP (Electromagnetic Pulse) suppression components into the rear shell of circular or d-sub

New Factory in Budapest Hungary
To increase LEMO's production capacities, a new factory has been built in Budapest-Hungary. The new factory has been running since November 2010 and has a total surface of 10'240 m2. It is the only LEMO Group factory that combines all the manufacturing processes within one site : injection molding, assembly and plating....